Infrastructure & Services

Centralised Water storage & distribution system
Centralised Water storage & distribution system
  • Under Ground reservoir – 700,000 litres capacity
  • Equipped with EBARA make Hydro Pneumatic System.
  • Delivery at doorstep for all plots
Rain Water Harvesting Ponds
Rain Water Harvesting Ponds
  • 340 Numbers of Rain Water Harvesting (RWH) pits all along the storm water drain
  • 3 Numbers of RWH ponds made with 7,000,000 litres storage capacity
110 KV substation
110 KV substation
  • 33 MVA capacity
  • Built & operate by State Electricity Board - TANGEDCO
Centralised Sewage Treatment Plant
Centralised Sewage Treatment Plant
  • 600,000 liters per Day treatment capacity
  • Approved by Tamil Nadu Pollution Control Board (TNPCB)
  • Connected to all plots
Rental Factory
Rental Factory
  • Ready to start factory space within MIP.
  • 40,000 square feet planned in first phase.
67% 2% 3% 10% 13% 3.7% 1.3%
Industrial Area Commercial Area Administrative Area Open Space Area
(Green Area)
Internal Roads Utility Area Sub-Station

For companies wanting to expand their operations while limiting their up-front capital expenditure, MIP offers infrastructure that will provide space to augment and set-up operations.

  • Excellent location, adjoining industrial cluster
  • Proximity to the Chennai Bengaluru highway
  • Excellent road, rail and sea connectivity
  • Internal road widths: 24m and 18m. Wide enough to manage container traffic
  • Flexible plot sizes starting from 1 acre
  • Total investment expected INR 3,000 crores
  • Readily available title clear land
  • Promoters’ existing presence and understanding of the region
  • Promoters’ experience in the manufacturing industry
  • Electricity substation by TANGEDCO within MIP premises
  • Supply of water at doorstep
  • Common STP for all Industries
  • Well designed storm water drainage system
  • Elevated above (Mean Sea Level) MSL +60.00 M



Amenities

The industrial park has amenities that will make each park in it a self sustainable business unit.


Water Availability

Water treatment plant, Rain water harvesting, Overhead tank

  • Zero discharge and zero run-off
  • Recycle-reuse
  • Treated water supply through pipe network
  • Bore well and external pipe water from TWAD board
  • Huge Rain water harvesting ponds in place

Centralised Sewage Treatment Plant (STP)

  • Capacity: 650 cu.m. per day. Collection manholes at all plots
  • Treatment of sewage from waste
  • Collected sewage is treated in STP through Membrane Bio Reactor (MBR) technology
  • Treated grey water will be used for landscaping & flushing

Power

  • Outdoor substation 110 kva: Capacity of 33 MVA Line for uninterrupted power supply
  • Roof-top solar panels: Installations on commercial buildings
  • High mast lamp: Improved illumination at traffic junctions, utility zones and common areas

Security

  • 24x7 security for common areas
  • CCTV camera at common areas
  • LED street lighting

Landscaping and Recreation

  • Green areas and landscaping
  • Proposed golf driving range
  • Avenue Trees

Tele-communications

  • Internet infrastructure
  • Telecom towers

Commercial

  • Restaurants
  • Convenience Shops
  • Banks and ATMs
Contact Us