340 Numbers of Rain Water Harvesting (RWH) pits all along the storm water drain
3 Numbers of RWH ponds made with 7,000,000 litres storage capacity
110 KV substation
33 MVA capacity
Built & operate by State Electricity Board - TANGEDCO
Centralised Sewage Treatment Plant
600,000 liters per Day treatment capacity
Approved by Tamil Nadu Pollution Control Board (TNPCB)
Connected to all plots
Rental Factory
Ready to start factory space within MIP.
40,000 square feet planned in first phase.
67%
2%
3%
10%
13%
3.7%
1.3%
Industrial Area
Commercial Area
Administrative Area
Open Space Area (Green Area)
Internal Roads
Utility Area
Sub-Station
For companies wanting to expand their operations while limiting their up-front capital expenditure, MIP offers infrastructure that will provide space to augment and set-up operations.
Excellent location, adjoining industrial cluster
Proximity to the Chennai Bengaluru highway
Excellent road, rail and sea connectivity
Internal road widths: 24m and 18m. Wide enough to manage container traffic
Flexible plot sizes starting from 1 acre
Total investment expected INR 3,000 crores
Readily available title clear land
Promoters’ existing presence and understanding of the region
Promoters’ experience in the manufacturing industry
Electricity substation by TANGEDCO within MIP premises
Supply of water at doorstep
Common STP for all Industries
Well designed storm water drainage system
Elevated above (Mean Sea Level) MSL +60.00 M
Amenities
The industrial park has amenities that will make each park in it a self sustainable business unit.
Water Availability
Water treatment plant, Rain water harvesting, Overhead tank
Zero discharge and zero run-off
Recycle-reuse
Treated water supply through pipe network
Bore well and external pipe water from TWAD board
Huge Rain water harvesting ponds in place
Centralised Sewage Treatment Plant (STP)
Capacity: 650 cu.m. per day. Collection manholes at all plots
Treatment of sewage from waste
Collected sewage is treated in STP through Membrane Bio Reactor (MBR) technology
Treated grey water will be used for landscaping & flushing
Power
Outdoor substation 110 kva: Capacity of 33 MVA Line for uninterrupted power supply